| Lat / long: | 44.7061, -113.3169 |
| Primary: | Lead |
| Secondary: | Silver |
| Tertiary: | Gold, Copper |
| Gangue: | Pyrite, Quartz |
| Orebody form: | TABULAR |
| Operation type: | Unknown |
| Production size: | None |
| Development status: | Past Producer |
| Host type: | Limestone |
| Associated type: | Granite |
| Structure: | Large Nw-Trending Mountain-Front Fault Which Is Both Pre-And Post-Mineralization., Alaskite Dike, While Pre-Mineralization, Has Had Some Structural Control On Ore Body |
| Alteration processes: | Silicification |
| MRDS | D006771 |
| MAS | 160590275 |
| DEP | 10011682 |
| Reference | {Deposit:: Commodity Files, U.S.G.S., Spokane, WA}{Deposit:: USGS Bulletin 528, PLATE 16, 182 P.}{Deposit:: ANNUAL REPORT MINING IDAHO FOR 1919, P 61} |
| Reporter | Lewis, Reed S. (Orris, Greta J.), Western Field Operations Center (WFOC) |