Mine detail: Alabama Mine

Previously called 'Grand Central Tunnel SiteAlabama Group: ClaimsAlabama No. 2DuluthGold Spike Nos. 1,2 and 3Jim Crow No. 2Homestake No. 2'

<< Back to the map

Location

Lat / long: 32.82844, -108.9862

Resource(M)

Primary: Gold, Silver
Secondary: Lead, Copper
Ore: Argentite, Chalcopyrite, Galena, Gold
Gangue: Quartz
Orebody form: PINCH AND SWELL

Production

Operation type: Unknown
Production size: Small
Development status: Past Producer
Last production ended: 1951

Geology

Host type:Rhyolite
Associated type:Rhyolite
Alteration processes:Silicification

References

MRDSD009487
DEP10013272
Reference{Deposit:: ELSTON, W.E., 1960 NMBMMR GEOLOGIC MAP, GM-15}{Deposit:: GILLERMAN, E., 1964 NMBMMR BULL 83, P. 195}{Deposit:: GRIGGS, R.L., AND WAGNER, H.C., 1966 USGS BULL 1222-E, 29 PAGES}{Deposit:: NMBMMR GENERAL FILE DATA}
ReporterMenzie, David