Mine detail: Bell #1,2 Claims

Previously called 'Bull #12 Claims'

<< Back to the map

Location

Lat / long: 39.70744, -113.59916

Resource(B)

Primary: Beryllium
Secondary: Uranium, Fluorine-Fluorite
Ore: Bertrandite, Fluorite, Uranophane
Gangue: Quartz
Orebody form: BLANKET
Discovery year: 1950

Production

Operation type: Unknown
Production size: None
Development status: Prospect

Geology

Host rock:Lake Bonneville Formation
Host type:Tuff,Rhyolite
Structure:Basin & Range
Tectonic:Sevier Orogenic Belt

References

MRDSDC13174
DEP10020406
Reference{Deposit:: MONTOYA, J.W., BAUR, G.S., & WILSON, S.R., 1963, MIN. INVEST. OF BE-BEARING TUFF, HONEYCOMB HILLS, JUAB CO., UT: USBM RI 6408, 11 P.}{Deposit:: STAATZ, M.H., & BAUER, H.L., JR., PRELIM. EXAMIN. OF THE URANIUM PROSPECT AT THE SPIDER #1 CLAIM, HONEYCOMB HILLS, JUAB CO., UT: US AEC RPT TEM-165, 1950}{Deposit:: MCANULTY, W.N. & LEVINSON, A.A., 1964, RARE ALKALI & BE MIN. IN VOL. TUFFS, HONEYCOMB HILLS, JUAB CO., UT: ECON. GEOL. V. 59, P. 768-774}{Deposit:: CONSV. DIV. COMP. DATE, 01-08-1971}{Deposit:: 1961 DIREXPL DOW CHEM. CO. 2930 FT OF DRILLIN}{Production:: EVERTS, 1980, ON SITE INVESTIGATION: UTAH GEOL. AND MINERAL SURVEY}
ReporterEverts, Mike L., Unknown