| Lat / long: | -29.81278, 115.26604 |
| Primary: | Zirconium, Titanium, Metal |
| Ore: | Ilmenite |
| Discovery year: | 1968 |
| Operation type: | Unknown |
| Production size: | Yes |
| Development status: | Producer |
| First production started: | 1974 |
| Last production ended: | 1987 |
| Host rock: | Yoganup Formation |
| Host type: | Sand and Gravel |
| Structure: | Eneabba Shoreline--Beach And Dune |
| Tectonic: | Perth Basin |
| MRDS | ISM0713 |
| DEP | 10024961 |
| Reference | {Deposit:: BAXTER J.L. 1977, HEAVY MINERAL SAND DEPOSITS OF WESTERN AUSTRALIA: GEOLOGICAL SURVEY OF WESTERN AUSTRALIA. MINERAL RESOURCES BULLETIN 10, P.77-80.}{Deposit:: RENISON GOLDFIELDS CONSOLIDATED LTD., 1987, ANNUAL REPORT 1987.} |
| Reporter | Fortowski, Dennis B., Towner, Roy R. |