| Lat / long: | 35.83343, -88.20003 |
| Primary: | Zirconium, Titanium, Metal |
| Ore: | Ilmenite |
| Discovery year: | 1956 |
| Operation type: | Unknown |
| Production size: | None |
| Development status: | Prospect |
| Structure: | Shoreline |
| Tectonic: | Basin |
| MRDS | ISM0767 |
| DEP | 10025015 |
| Reference | {Deposit:: HERSHEY, R.E., 1970, MINERAL RESOURCE SUMMARY OF THE SEVENTTEN CREEK QUADRANGLE, TENNEESSEE: NASHVILLE, TENNESSEE DIVISION OF GEOLOGY.}{Deposit:: HERSHEY, R.E., 1967, MINERAL RESOURCES UMMARY OF THE HOLLADAY QUADRANGLE, TENNESSEE: NASHVILLE, TENNESSEE DIVISION OF GEOLOGY.}{Deposit:: HERSHEY, R.E., 1968, MINERAL RESOURCES SUMMARY OF THE CHESTERFIELD QUADRANGLE, TENNESSEE: NASHVILLE, TENNESSEE DIVISION OF GEOLOGY.}{Production:: ZR/105} |
| Reporter | Larsen, Curtis E., Force, Eric R. |