| Lat / long: | 40.58383, -112.15636 |
| Primary: | Gold |
| Secondary: | Silver |
| Tertiary: | Tellurium, Arsenic, Antimony, Thallium, Barium-Barite, Uranium, Strontium, Selenium, Zinc, Nickel |
| Ore: | Gold |
| Operation type: | Unknown |
| Production size: | Small |
| Development status: | Producer |
| Production years: | PHASE A: 1989-1990; PHASE B SCHEDULED TO BEGIN MINING IN JANUARY 1993. |
| First production started: | 1989 |
| Host type: | Limestone,Volcanic Breccia (Agglomerate) |
| Structure: | The Ne-Plunging, Nw-Dipping Overturned Melco Syncline Trends Through The Melco Deposit. |
| MRDS | RE00263 |
| DEP | 10055197 |
| Reference | KENNECOTT UTAH COPPER, 1991, BARNEYS CANYON MINE FACT SHEET - MINING |
| Reporter | Phinisey, J. D. (Marcus, S.) |