Reference | {Deposit:: DIRECCION NACIONAL DE MINERIA Y GEOLOGIA, 1991, REPORT ON THE ARGENTINE MINING SECTOR, ARGENTIINE SELECTED MINING PROJECT: BUENOS AIRES.}{Deposit:: ANON., 1994, SUNSHINE POSTS REDUCED LOSS: THE NORTHERN MINER, V. 80, NO. 38, P. 15.}{Other Database:: CIMRI}{Production:: EMPRESA ARGENTINA DE CEMENT ARMADO HAS SHIPPED 4000 TONS OF ORE AVERAGING 3 OZ GOLD PER TON SPORADICALLY.} |