Mine detail: Southern Pennines Fluorspar Ore Field

Previously called ''

<< Back to the map

Location

Lat / long: 53.13231, -1.53094

Resource(B)

Primary: Fluorine-Fluorite, Barium-Barite
Secondary: Lead, Zinc
Tertiary: Calcium, Copper, Iron
Gangue: Calcite, Pyrite
Orebody form: PINCH AND SWELL (VEINS)

Production

Operation type: Unknown
Production size: Yes
Development status: Producer
First production started: 1899

Geology

Host rock:Visean L.S.;Namurian Shales Of Millstone Grit Series
Host type:Shale,Limestone
Associated rock:Olivine Dolerite Sills (Intrusive)
Associated type:Diorite,Tuff
Structure:Derbyshire Dome To The West, Faulted And Jointed Folded Structures (Peak Forest, Matlock Anticlines; Longstone Edge Monocline; Abney, Chatsworth And Stanton Synclines; Bonsal And Gulf Faults With Graben In Between. Major Fault Trend Is Easterly To East - Northeasterly.)
Alteration processes:Dolomitization, Silicification Of Host Rock

References

MRDSW006984
DEP10069449
Reference{Deposit:: BLUNDEN, J., 1975, THE MINERAL RESOURCES OF BRITAIN, HUTCHINSON & CO. LTD., LONDON, P. 241 - 260}{Deposit:: MASON, J.E., 1974, GEOLOGY OF THE DERBYSHIRE FLUORSPAR DEPOSITS, UNITED KINGDOM, IN A SYMPOSIUM ON THE GEOLOGY OF FLUORSPAR: KY. GEOLOGICAL SURVEY SPECIAL PUB. 22 P. 10 - 22}{Deposit:: NOTHOLT, A.J.G. AND HIGHLEY, D.E., 1971, FLUORSPAR: INST. GEOL. SCIENCES, MINERAL RESOURCES CONSULTATIVE COMM., MINERAL DOSSIER NO. 1, 31 P.}{Deposit:: FORD, T.D. AND INESON, P.R., 1971, THE FLUORSPAR MINING POTENTIAL OF THE DERBYSHIRE OREFIELD: INST. OF MIN. MET. TRANS., V. 80, N. 777, P. B186 - B210}{Production:: BLUNDEN, J., 1975, MIN. RES. OF BRITAIN. FORD, T.D. AND INESON, P.R., 1971, DERBYSHIRE OREFIELD}
ReporterSchruben, Paul G.