Mine detail: Primorose Beryl Lode

Previously called ''

<< Back to the map

Location

Lat / long: 40.55831, -105.45059

Resource(B)

Primary: Beryllium, Mica, Manganese
Ore: Beryl, Muscovite

Production

Operation type: Unknown
Production size: Small
Development status: Past Producer
First production started: 1963
Last production ended: 1963

Geology

Host rock:Metasedimentary Rocks--Mica Schist;Pegmatite
Host type:Mica Schist
Associated rock:Pegmatite;Tonalite (Quartz Diorite)
Associated type:Tonalite,Pegmatite
Structure:Front Range Uplift, Thompson Canyon Fault, Mt Olympus Batholith, Ne-Trending Folds
Tectonic:Central Cordillera (Southern Rocky Mtns)

References

MRDSD010336
DEP10087860
Reference{Deposit:: THURSTON, W.R., 1955, PEGMATITES OF THE CRYSTAL MOUNTAIN DISTRICT, LARIMER COUNTY, COLORADO: USGS BULL. 1011, 185 P., 13 PLS.}{Deposit:: COLORADO DIV. MINES ANN. OPERATOR REPTS.}{Production:: COLORADO DIV. MINES ANN. OPERATOR REPT.}
ReporterSchwochow, Stephen D.