Mine detail: Horseshoe Hill Prospects

Previously called ''

<< Back to the map

Location

Lat / long: 39.86856, -112.1069

Resource(M)

Primary: Silver, Lead, Zinc, Copper
Ore: Malachite, Smithsonite
Orebody form: TABULAR

Production

Operation type: Unknown
Deposit type: Vein
Production size: None
Development status: Occurrence

Geology

Associated rock:Monzonite Porphyry Of The Sunrise Peak Stock;Latite Of Copperopolis Canyon (Tuff Member)
Associated type:Monzonite,Tuff
Structure:Probably With Boundary Of Tintic Mountain Caldera, N 53 E Trending Fault To Se Of Workings
Tectonic:Basin And Range

References

MRDSM058480
DEP10088761
Reference{Deposit:: LINDGREN, W. AND LOUGHLIN, G.F., 1919, GEOLOGY AND ORE DEPOSITS OF THE TINTIC MINING DISTRICT, UTAH: USGS PROF. PA. 107, 282 P.}{Deposit:: COOK, D.R., (ED.), 1957, GEOLOGY OF THE EAST TINTIC MOUNTAINS AND ORE DEPOSITS OF THE TINTIC MINING DISTRICT: UTAH GEOL. SOC. GUIDEBOOK, NO. 12, 183 P.}{Deposit:: TRIPP, B.T., 1982, ON SITE INVESTIGATION: UGMS.}{Deposit:: MORRIS, H.T., 1975, GEOLOGIC MAP AND SECTIONS OF THE TINTIC MOUNTAIN QUADRANGLE AND ADJACENT PARTS OF THE MCINTYRE QUADRANGLE, JUAB AND UTAH COUNTIES, UTAH: USGS MAP I-883.}
ReporterTripp, Bryce T.