Mine detail: Cedar Canyon

Previously called ''

<< Back to the map

Location

Lat / long: 45.37107, -103.15917

Resource(M)

Tertiary: Uranium
Ore: Carnotite
Discovery year: 1953

Production

Operation type: Unknown
Production size: None
Development status: Occurrence

Geology

Host rock:Paleo Ludlow Formation;Oligo Chadron Formation;Arikaree Formation;Landslide Material
Host type:Bentonite,Siltstone,Sandstone
Structure:Homocline Dips To The Northeast Generally Less Than 1 Deg In The Hell Creek And Ludlow Formations; Chadron And Arikaree Formations Are A Gentle Syncline; Two Major Unconformities - One At The Base Of Oligocene And The Other At The Base Of Miocene; Many Landslide Blocks

References

MRDSSD01748
DEP10092995
Reference{Deposit:: PETSCH, BRUNO C., 1955 , GOVERT QUAD, SOUTH DAKOTA GEOLOGICAL SURVEY}{Deposit:: GILL, JAMES R. AND MOORE, GEORGE W., 1955 , CARNOTITE-BEARING SANDSTONE IN CEDAR CANYON, SLIM BUTTES, HARDING COUNTY, SOUTH DAKOTA, USGS BULLETIN 1009 - I}
ReporterBarari, Rachel A.