Reference | {Deposit:: MESA HEALTH AND SAFETY INSPECTION REPORT NOV. 30 AND DEC. 2, 1971.}{Deposit:: NC GEOL SURVEY}{Deposit:: QUARRY IS OWNED AND OPERATED BY IDEAL CEMENT COMPANY, DIVISION OF}{Deposit:: IDEAL BASIC INDUSTRIES. OPERATION INCLUDES A MILL AT THE QUARRY.} |