Mine detail: Spider #1, 2 Claims

Previously called ''

<< Back to the map

Location

Lat / long: 39.70716, -113.58916

Resource(B)

Primary: Uranium
Secondary: Fluorine-Fluorite, Beryllium
Ore: Uranophane
Gangue: Quartz
Orebody form: BLANKET
Discovery year: 1950

Production

Operation type: Unknown
Production size: Small
Development status: Past Producer

Geology

Host rock:Lake Bonneville Formation
Host type:Tuff,Rhyolite
Structure:Basin & Range, Honeycomb Hills Is A Small Erosional Remnant.
Tectonic:Sevier Orogenic Belt

References

MRDSD006520
DEP10101664
Reference{Deposit:: MONTOYA, J.W., BAUR, G.S., & WILSON, S.R., 1963, MIN. INVEST. OF BEBEARING TUFF, HONEYCOMB HILLS, JUAB CO., UT: USBM RI 6408, 11 P.}{Deposit:: STAATZ, M.H., & BAUER, H.L., JR., PRELIM. EXAMIN. OF THE URANIUM PROSPECT AT THE SPIDER #1 CLAIM, HONEYCOMB HILLS, JUAB CO., UT: USAEC RPT TEM-165, 1950}{Deposit:: MCANULTY, W.N. & LEVINSON, A.A., 1964, RARE ALKALI & BE MIN. IN VOL. TUFFS, HONEYCOMB HILLS, JUAB CO., UT: ECON. GEOL. V. 59, P. 768-774}{Deposit:: 1961 DIREXPL DOW CHEM. CO. (1961) 2,930 FT DRILLIN}{Production:: EVERTS, M.L., 1980, ON SITE INVESTIGATION: UTAH GEOL. AND MINERAL SUR.}
ReporterEverts, Michael L.