Mine detail: No. 1 Mine

Previously called 'James Carroll Clearing Company'

<< Back to the map

Location

Lat / long: 34.85011, -81.64983

Resource(N)

Primary: Clay

Production

Operation type: Surface
Development status: Producer

Geology

References

MAS450210062
DEP10129334
Reference{Deposit:: MSHA INSPECTION REPORT 5/5/81}{Deposit:: MSHA LIST 5/18/81}
ReporterEastern Field Operations Center (EFOC)