Reference | {Deposit:: MINE AND CONC-2 SHAFTS, CONC-284,000MT ORE MILLED, EXTRACTIO}{Deposit:: D-FLOTATION, GRAVITY SEPARATION, MAGNETIC SEPARATION, WASHIN}{Deposit:: NING, 340 EMPLOYEES, CU ORE-2,000 TPD, CU 100TPD, ZN CONC-35}{Deposit:: VELOPED BY VERTICAL SHAFT, SYSTEM OF MINING-LONG HOLE BLASTI}{Deposit:: LAR RECOVERY, MECHANIZED CUT AND FILL, ROOM AND PILLAR} |