Reference | {Deposit:: LKAB, GEOLOGY, MINING, PRODUCTION INFORMATION, COMPANY}{Deposit:: BROCHURE.}{Deposit:: E/MJ, NEW HAULAGE LEVEL AT KIRUNA, SWEDEN, HAS MASSIVE}{Deposit:: CAPACITY AND A DESIGN FOR LONG LIFE, JUNE, 1978, PP 171-}{Deposit:: 179.}{Deposit:: NILSSON, D., KIIRUNAVAARA - WORL* LARGEST UNDERGROUND}{Deposit:: MINE, SKILLING*MINING REVIEW, NOVEMBER, 1978, PP 12-16.}{Deposit:: STOCKEL, I., VENTILATION AT THE UNDERGROUND MINE}{Deposit:: KIIRUNAVAARA, FABRICII TRYCKERI EFTR. KIRUNA, 1976, 10 PP.}{Deposit:: MINING MAGAZINE, MECHANISATION AT KIRUNA, FEBRUARY, 1971,}{Deposit:: VOL. 124, NO. 2, PP 96-105.}{Deposit:: WESTERN MINER, NEW TRANSPORTATION SYSTEM DEVELOPED AT KIRUNA}{Deposit:: MINE IN SWEDEN, JUNE, 1979, PP 29-34.}{Deposit:: HEDEN, H., LIDIN, K., AND MALMSTROM, R., SUBLEVEL CAVING}{Deposit:: TECHNIQUES OPTIMIZE KIIRUNAVAARA PRODUCTION, SOCIETY OF}{Deposit:: MINING ENGINEERS, OCTOBER, 1979, PP 1458-1460.}{Reserve-Resource:: AME MINERAL ECONOMICS QUARTERLY MINE ANALYSIS, 6/93, P. 36.} |