Mine detail: Mcgilliuray Construction Co.

Previously called 'Mather Feild Pit'

<< Back to the map

Location

Lat / long: 38.5399, -121.30793

Resource(N)

Primary: Sand and Gravel, Construction
Tertiary: Stone, Crushed/Broken

Production

Operation type: Surface
Development status: Past Producer

Geology

References

MRDSW024638
MAS60670022
DEP10140002
Reference{Deposit:: 16 ACRES IN SECS 15 AND 22, PRODUCES 150 TONS PER HOUR}{Deposit:: CAL JOUR MINES AND GEOL V51 NO2 APR 1955}
ReporterWestern Field Operations Center (WFOC)