Mine detail: Entiat Valley No. 34

Previously called 'Pope Creek'

<< Back to the map

Location

Lat / long: 47.97202, -120.54948

Resource(N)

Primary: Pumice

Production

Operation type: Surface
Development status: Prospect

Geology

References

MAS530070147
DEP10156068
Reference{Deposit:: WA DIV MIN & GEOL REPT INV 15,P 44, LOCALITY 34.}{Deposit:: WASH DIV MINES & GEOL BULL 37, PART I, V. 1, P. 86.}{Deposit:: WASH STATE INSTITUTE TECH BULL 242, P. 2, 6, NO. 34.}
ReporterCausey, J. Douglas