Reference | {Deposit:: MINING RECORD, V 106/N 29, 7/17/95, P.5.}{Deposit:: BINGHAM, E.R., AND J.R. SUFFRON. TAILINGS AREA RECLAMATION}{Deposit:: AT WHITE PINE COPPER COMPANY. PROC. OF THE JOINT MIN.}{Deposit:: AND MET. INST. OF JAPAN - AIME: WORLD MIN. AND MET.}{Deposit:: TECHNOL., DENVER, COLORADO, SEPT. 1-3, 1976, PUBLISHED}{Deposit:: BY AIME, NEW YORK, 1976, V. 2, PP. 741-753.}{Deposit:: COMPRESSED AIR MAGAZINE. REAWAKENED GIANT. MAY 1968,}{Deposit:: PP. 10-16.}{Deposit:: COPPER RANGE COMPANY. THE WHITE PINE STORY. COMPANY}{Deposit:: PUBLICATION, OCTOBER 1968, 19 PP.}{Deposit:: COPPER RANGE COMPANY. WHITE PINE, AN INTRODUCTION TO WHITE}{Deposit:: PINE COPPER DIVISION, COPPER RANGE COMPANY. COMPANY}{Deposit:: PUBLICATION, JANUARY 1982, 4 PP.}{Deposit:: ENSIGN, C.O., ET AL. COPPER DEPOSITS IN THE NONESUCH}{Deposit:: SHALE, WHITE PINE, MICHIGAN. CH. IN ORE DEPOSITS OF}{Deposit:: THE UNITED STATES, 1933-1967, V. 1, ED. BY J.D. RIDGE.}{Deposit:: AIME, NEW YORK, 1968, PP. 462-488.}{Deposit:: HAMILTON, W.A., AND V. LESSELS. THE WHITE PINE CONCENTRA-}{Deposit:: TOR. MIN. ENG., V. 8, MAY 1956, PP. 510-516.}{Deposit:: HAYS, R.M., J.R. SUFFRON, D.Z. SKOLASINSKI, AND J.B.}{Deposit:: WAKELEE. WHITE PINE COPPER - AN ENVIRONMENTAL AND}{Deposit:: ECONOMIC ASSESSMENT. PRES. AT 108TH ANNUAL MEETING,}{Deposit:: AIME, NEW ORLEANS, LOUISIANA, FEB. 18-22, 1979, AIME}{Deposit:: PREPRINT NO. 79-59, 19 PP.}{Deposit:: LEONE, R.J., R.W. SEASOR, AND T.J. ROHRBACHER. GEOLOGY OF}{Deposit:: THE WHITE PINE AREA. CH. IN GUIDEBOOK FOR FIELD CON-}{Deposit:: FERENCE, MICHIGAN COPPER DISTRICT, SEPTEMBER 30 -}{Deposit:: OCTOBER 2, 1971, ED. BY W.S. WHITE. MICHIGAN TECH.}{Deposit:: UNIV., HOUGHTON, MICHIGAN, 1971, PP. 44-64.}{Deposit:: RAMSEY, R.H. WHITE PINE COPPER. ENG. AND MIN. J., V. 154,}{Deposit:: NO. 1, JANUARY 1953, PP. 72-87.}{Deposit:: THOMPSON, R.J. DEVELOPMENT MINING AT WHITE PINE (A CASE}{Deposit:: STUDY). PROC. 2ND SYMP. ON RAPID EXCAVATION, OCT.}{Deposit:: 16-17, 1969, PAPER NO. 8, 22 PP.}{Deposit:: TIEN, J., AND J. BJORK. COMPUTER HELPS VENTILATION PLANNING}{Deposit:: AT WHITE PINE COPPER MINE. ENG. AND MIN. J., V. 168,}{Deposit:: NO. 8, AUGUST 1976, PP. 70-73.}{Deposit:: WHILTON, R.W. PROGRAMMED MAINTENANCE BOOSTS MINE PRODUCTIV-}{Deposit:: ITY, CONSERVES LUBRICANTS. MIN. CONG. J., V. 61,}{Deposit:: NO. 6, JUNE 1975, PP. 38-41.}{Deposit:: WHITE, W.S., AND J.C. WRIGHT. THE WHITE PINE COPPER DEPOS-}{Deposit:: IT, ONTONAGON COUNTY, MICHIGAN. ECON. GEOL., V. 49,}{Deposit:: NOVEMBER 1954, PP. 675-716.}{Deposit:: SKILLINGS, COPPER RANGE INCREASING COPPER PRODUCTION AT}{Deposit:: WHITE PINE OPERATION TO HIGHEST LEVEL SINCE ITS REOPENING}{Deposit:: IN 1985, 1/11/92, P.24-26.}{Deposit:: FISCOR, STEVE, COPPER RANGE IMPROVES PRODUCTIVITY AND LOWER}{Deposit:: COSTS TO MEET THE CHALLENGES OF MINING IN THE 90,}{Deposit:: ENGINEERING AND MINING JOURNAL, 2/92, P.C26,C27.}{Deposit:: DILLARD, GARY, METALL, USING COPPER RANGE, PLANS TO BE MAJOR}{Deposit:: COPPER PLAYER, SOUTHWESTERN PAY DIRT, 9/93, P.14A-18A.}{Deposit:: METAL BULLETIN MONTHLY, COPPER RANGE STUDIES IN-SITU}{Deposit:: LEACHING, 2/94, P.70.}{Deposit:: MINING RECORD, METALL MINING ANNOUNCES INCREASED COPPER}{Deposit:: PRODUCTION, V 106/ N 11, 3/15/95, P.13.}{Deposit:: PAY DIRT, 10-95, P.19B.}{Deposit:: MINING RECORD, V 106 N29, 7-19-95, P.5.}{Deposit:: SKILLING*MINING REVIEW, 2-2-91, P.7.}{Deposit:: SKILLING*MINING REVIEW, 8-25-90, P.4.}{Deposit:: MINING JOURNAL, 2-10-89, P117.}{Deposit:: SKILLING*MINING REVIEW, 1-21-89, P.7.}{Deposit:: ENGINEERING AND MINING JOURNAL, 1-90, P.C47.}{Deposit:: MINING ENGINEERING, VOL 49, #4, APRIL, 1997, PP. 62-67 & PP.}{Deposit:: 68-72.}{Reserve-Resource:: METALL MINING CORP., 1989 ANNUAL REPORT, P.8.}{Reserve-Resource:: METALL MINING CORP., 1990 ANNUAL REPORT, P.8.}{Reserve-Resource:: METALL MINING CORP., 1991 ANNUAL REPORT, P.9.}{Reserve-Resource:: METALL MINING CORP., 1993 ANNUAL REPORT, P.7.}{Reserve-Resource:: METAL BULLETIN MONTHLY, 2/94, P.70.}{Reserve-Resource:: ROCKY MOUNTAIN PAY DIRT, 5/94, P.17B.} |