Reference | {Deposit:: MSHA INSPECTION 1981}{Deposit:: NC GEOLOGICAL SURVEY.}{Deposit:: OPERATION INCLUDES A MILL AT THE MINE AND PRODUCES SCRAP MIC}{Deposit:: FROM 1975 EMJ DIR-500000 TO 1 MILLION TONS ORE. FROM 1974 M}{Deposit:: DATA-MINE 63 MEN, MILL 37 MEN.}{Deposit:: CMS/RCF LISTS 10/81}{Deposit:: 1981 MSHA LIST} |