Reference | {Deposit:: MESA HEALTH AND SAFETY INSPECTION REPORT AUGUST 15, 1975.}{Deposit:: NC GEOL SURVEY}{Deposit:: PLANT PROCESSES SAND DREDGED FROM THE DAN RIVER AND IS OWNED}{Deposit:: OPERATED BY DOYLE READY-MIX CONCRETE COMPANY.}{Deposit:: RCF LIST 10/81}{Deposit:: CMS LIST 10/81}{Deposit:: NOT ON 1980 OR 1981 MSHA LIST; ASSUME PAST PRODUCER} |