Reference | {Deposit:: GOLDER ASSOC., 1980, DEPOSIT PROFILE NORANDA MINES LTD.}{Deposit:: (GECO DIVISION) ONTARIO, CANADA: CONFIDENTIAL REPORT}{Deposit:: PREPARED FOR U.S. BUREAU OF MINES MINERALS AVIALABILITY}{Deposit:: SYSTEM BY GOLDER ASSOC., CONSULTING MINING AND GEOTECH-}{Deposit:: NICAL ENGINEERS, CONTRACT NO. J02950059, 12 P.}{Deposit:: PABST, M., 1980, GECO ENTERS*0S WITH MILL UPDATE: CANAD.}{Deposit:: MIN. JOUR., P. 32-42.}{Deposit:: MARSHALL, G.M.T., 1959, BLASTHOLE MINING AT GECO: MINING}{Deposit:: ENGINEERING, AUGUST, 1959, P. 797-802.}{Deposit:: MCLEOD, P.C., AND SCHWARTZ, A., 1970, CONSOLIDATED FILL AT}{Deposit:: NORANDA MINES LIMITED (GECO DIVISION): CIM BULL., SEPT.,}{Deposit:: 1970, P. 1011-1018.}{Deposit:: BROOKS, L.S., AND BARNETT, C., 1978, NORANDA MINES LIMITED-}{Deposit:: GECO DIVISION: CIM SPECIAL VOLUME NO. 16, P. 182-184.}{Deposit:: BROWN, W.L., AND BRAY, R.C.E., 1960, THE GEOLOGY OF THE}{Deposit:: GECO MINE: TRANSACTIONS OF CANADIAN INSTITUTE OF MINING}{Deposit:: AND METALLURGY AND THE MINING SOCIETY OF NOVA SCOTIA,}{Deposit:: VOL. 63, P. 1-9.}{Deposit:: MCLEOD, P.C., 1958, THE UNDERGROUND PHASE OF THE GECO}{Deposit:: PROJECT, SOME METHODS USED TO MEET A PRODUCTION DATE:}{Deposit:: CIM BULL., VOL. 51, P. 616-623.}{Deposit:: WAINWRIGHT, R.R., 1965, OPERATING EXPERIENCE WITH FRICTION-}{Deposit:: TYPE HOISTS AT GECO MINES LIMITED: CIM BULL., VOL. 58,}{Deposit:: P. 36-41.}{Deposit:: HARVEY, W.M., HEAVY DUTY FRICTION HOISTING AT GECO MINES:}{Deposit:: CIM BULL., VOL. 68, P. 315-320.}{Deposit:: CANADIAN MINES HANDBOOK - 1979-80, P. 192.}{Deposit:: ENGINEERING/MINING JOURNAL, 1978, INTERNATIONAL DIRECTORY}{Deposit:: OF MINING: P. 243.}{Deposit:: THOMSON, J.E., FERGUSON, S.A., JOHNSTON, W.G.Q., PYE, E.G.,}{Deposit:: SAVAGE, W.S., AND THOMSON, R., 1957, COPPER, NICKEL, LEAD,}{Deposit:: AND ZINC DEPOSITS IN ONTARIO: ONTARIO DEPT. OF MINES,}{Deposit:: METAL RESOURCES CIRC. NO. 2, P. 49-50.}{Deposit:: METALS SOURCE BOOK, 1973, PAGE UNKNOWN.}{Deposit:: MINISTRY OF NATURAL RESOURCES ONTARIO, 1976, TOWARDS A ZINC}{Deposit:: POLICY FOR THE PROVINCE OF ONTARIO: PAPER #3, MINERAL}{Deposit:: POLICY BACKGROUND, P. 90.}{Deposit:: CRANSTONE, D.A., AND WHILLANS, R.T., 1978, CANADIAN RESERVES}{Deposit:: OF NICKEL, LEAD, ZINC, MOLYBDENUM, SILVER, AND GOLD AS OF}{Deposit:: JAN. 1, 1978: P. 13.}{Deposit:: MCLEOD, P.C., 1973, L.H.D. TRAINING AT THE GECO MINE:}{Deposit:: CANADIAN MINING JOURNAL, SEPT., 1973, P. 6.}{Deposit:: URBANOSKI, L., 1978, APPLICATION OF THE INAX ENERGY DISPER-}{Deposit:: SIVE X-RAY ANALYSER ONSTREAM ANALYSIS AT GECO: CANADIAN}{Deposit:: MINING JOURNAL, MARCH, 1978, P. 31-32.}{Deposit:: MOOKHERJEE, A., AND DUTTA, N.K., 1970, EVIDENCE OF INCIPIENT}{Deposit:: MELTING OF SULFIDES ALONG A DIKE CONTACT, GECO MINE,}{Deposit:: MANITOUWADGE, ONTARIO: ECONOMIC GEOLOGY, VOL. 65, P. 706-}{Deposit:: 713.}{Deposit:: DEPT. OF ENERGY, MINES AND RESOURCES OTTAWA, 1971, CANADIAN}{Deposit:: MINERALS YEARBOOK: P. 127.}{Reserve-Resource:: CANADIAN MINES HANDBOOK - 1979-80, 1980, P. 192.}{Reserve-Resource:: CANADIAN MINES HANDBOOK 1986-87, NORTHERN MINER PRESS,P.282.}{Reserve-Resource:: MINE RESERVES AND CURRENTLY PROMISING DEPOSITS, JAN. 1985,}{Reserve-Resource:: EMR CANADA, MR 209, P. 18.}{Reserve-Resource:: NORANDA MINERALS INC., 1989 ANNUAL REPORT, P, 9.}{Reserve-Resource:: CANADIAN MINES HANDBOOK, 1992-1993, P-256.}{Reserve-Resource:: AME MINERAL ECONOMICS QUARTERLY MINE ANALYSIS, JUNE 1993,}{Reserve-Resource:: P. 43, 48.} |