Mine detail: Corrego Do Feijao

Previously called ''

<< Back to the map

Location

Lat / long: -20.10249, -44.12566

Resource(M)

Primary: Iron
Other material: Calcite, Dolomite, Hematite, Limonite, Mica, Quartz

Production

Operation type: Surface
Development status: Producer

Geology

References

MAS3510230036
DEP10182434
Reference{Deposit:: SKILLING*MINING REVIEW, FERTECO IRON ORE SHIPMENTS AT}{Deposit:: RECORD 6,584,000 M.T. IN 1979, MAY 24, 1980.}{Deposit:: SKILLINGS, JR., D.N., FERTECO OPERATING NEW PRODUCTION}{Deposit:: FACILITIES AT FABRICA, SKILLING*MINING REVIEW, NOVEMBER}{Deposit:: 12, 1977, PP 10-17.}
ReporterBolis