| Lat / long: | 34.06557, 56.66792 |
| Tertiary: | Lead |
| Other material: | Cerussite, Galena |
| Operation type: | Underground |
| Development status: | Past Producer |
| First production started: | 1954 |
| MAS | 5070600001 |
| DEP | 10182843 |
| Reference | {Deposit:: BUNDESANSTALT FUR BODENFORSCHUNG. IRAN. 1974.}{Deposit:: 75 WRIGHT, W. W., LEAD AND ZINC IN IRAN, US AID, 1965.}{Deposit:: 75 BURNOL, L., GEOLOGICAL SURVEY OF IRAN, REPORT NO. 11, 196} |
| Reporter | Wilburn, David R. |