Mine detail: (Facility) Copper Cliff Copper Refinery

Previously called ''

<< Back to the map

Location

Lat / long: 46.49999, -80.99977

Resource(M)

Primary: Copper
Secondary: Gold, Nickel, Selenium, Silver, Tellurium

Production

Operation type: Processing Plant
Development status: Plant
First production started: 1888

Geology

References

MAS1220402001
DEP10206559
Reference{Deposit:: CANADIAN MINES HANDBOOK 1979-80, P. 309.}{Deposit:: PINCOCK, ALLEN & HOLT, INC.; THE DEVELOPMENT OF ENGINEERING,}{Deposit:: OPERATING AND ENVIRONMENTAL COST DATA FOR INTERNATIONAL}{Deposit:: COPPER SMELTING AND REFINING OPERATIONS. BUMINES CONTRACT}{Deposit:: J0290007; FOR INF., CONTACT S.W. TOWLE, TPO, BUMINES-}{Deposit:: MAFO, DENVER, CO.}{Deposit:: METALS WEEK, 3/2/92, P. 8.}{Deposit:: E&MJ, 3/92, P. 48.}{Deposit:: THE NORTHERN MINER, 9/30/91, P. 19.}
ReporterTowle, Stewart W.