Mine detail: (Facility) Electrozinc Lead Smelter

Previously called 'OrdzhonikidzeOrdzhonikidze Lead PlantVladikavkaz'

<< Back to the map

Location

Lat / long: 43.04837, 44.68477

Resource(M)

Primary: Lead, Refiner

Production

Operation type: Processing Plant
Development status: Plant
First production started: 1904

Geology

References

MAS4520007023
DEP10206697
Reference{Deposit:: CRU STUDY. 1991.}{Deposit:: WORLD BANK. A STUDY OF THE SOVIET ECONOMY. 1991.}
ReporterWilburn, David R.