Reference | {Deposit:: BUANGFU, CENG, AND NENGOING, SHANG, TREATMENT FLOWSHEET TEST}{Deposit:: OF TUNGSTEN ORE SLIME, NONFERROUS METALS, BEIJING, AUG.}{Deposit:: 1981, P. 32-35.}{Deposit:: WANG, K.P., THE PEOPL* REPUBLIC OF CHINA, A NEW INDUSTRIAL}{Deposit:: POWER WITH A STRONG MINERAL BASE, USBM, 1975, PP. 96}{Deposit:: WEISUN, WU, CHINESE TUNGSTEN ORE, PROCEEDINGS OF THE FIRST}{Deposit:: INTERNATIONAL TUNGSTEN SYMPOSIUM, STOCKHOLM, 1979,}{Deposit:: P. 118-126.}{Deposit:: WYLLIE, R.J.M. AND PAZOUR, DONALD, ZIHUASHAN MINES, MILLS}{Deposit:: 3,000 DAILY TONS OF TUNGSTEN ORE, MINING WORLD, OCT.}{Deposit:: 1979, P. 92-97.}{Deposit:: ZINHUA NEWS AGENCY, XINHUA VIEWS WORK ENVIRONMENT AT JIANGXI}{Deposit:: TUNGSTEN MINE, AUG. 1, 1979.}{Deposit:: XINHUA NEWS AGENCY, JIANGXI TUNGSTEN MINE, SILICO*,}{Deposit:: JUNE 21, 1980.} |