| Lat / long: | 39.468, -118.77178 |
| Primary: | Gold |
| Tertiary: | Silver |
| Operation type: | Processing Plant |
| Development status: | Plant |
| First production started: | 1981 |
| MAS | 320019004 |
| DEP | 10221803 |
| Reference | {Deposit:: NEV. DIV. MINE INSPECTION, 1981, DIRECTORY OF NEVADA MINE}{Deposit:: OPERATIONS ACTIVE DURING CALENDAR YEAR 1980, P. 4.}{Deposit:: NEV. DIV. MINE INSPECTION, 1982, DIRECTORY OF NEVADA MINE}{Deposit:: OPERATIONS ACTIVE DURING CALENDAR YEAR 1981, P. 4.} |
| Reporter | Ridenour, James |