Mine detail: Tenabo Test Site

Previously called ''

<< Back to the map

Location

Lat / long: 40.31381, -116.68013

Resource(M)

Primary: Gold
Tertiary: Silver

Production

Operation type: Processing Plant
Development status: Plant
First production started: 1980

Geology

References

MAS320159018
DEP10222130
Reference{Deposit:: NEV. DIV. MINE INSPECTION, 1981, DIRECTORY OF NEVADA MINE}{Deposit:: OPERATIONS ACTIVE DURING CALENDAR YEAR 1980, P. 42.}
ReporterRidenour, James