Reference | {Deposit:: BERK, R., H. LAX, W. PROST, AND J. SCOTT. ALUMINUM: PROFILE}{Deposit:: OF THE INDUSTRY. METALS WEEK, MCGRAW HILL INC., 1982,}{Deposit:: 201 PP.}{Deposit:: BONNEVILLE POWER ADMINISTRATION. 1985 INITIAL RATE}{Deposit:: PROPOSAL. DOCUMENTATION FOR LOADS AND RESOURCES STUDY.}{Deposit:: V. 1, AUG. 1984, 496 PP.}{Deposit:: BROOK HUNT AND ASSOCIATES LTD. (LONDON). ALUMINUM}{Deposit:: PRODUCTION COST SURVEY 1980-1982; V. 1, SUMMARY, 119 PP.,}{Deposit:: V. II, APPENDIX, 314 PP., JAN., 1984}{Deposit:: CORPS OF ENGINEERS. EXCERPTS FROM DRAFT ENVIRONMENTAL}{Deposit:: IMPACT STATEMENT, ARCO/TRANS MOUNTAIN OIL PIPELINE}{Deposit:: PROJECT. DEPT. OF THE ARMY, 1977.}{Deposit:: CORPS OF ENGINEERS. REPORT ON FLOOD CONTROL, NOOKSACK}{Deposit:: RIVER, WASHINGTON. DEPT. OF THE ARMY, 1973.}{Deposit:: GOVETT, M. H. AND J. LARSON. THE WORLD ALUMINUM INDUSTRY.}{Deposit:: AUSTRALIAN MINER. ECON. PTY. LTD., SYDNEY, AUSTRALIA,}{Deposit:: 1981, 387 PP.}{Deposit:: INTACO. THIS IS INTALCO. INTALCO ALUMINUM CORPORATION,}{Deposit:: APRIL 1984, 18 PP.}{Deposit:: JOHN MOBERLY ASSOCIATES. PRIMARY ALUMINUM PRODUCTION COSTS}{Deposit:: IN THE PACIFIC NORTHWEST. PREPARED FOR BPA, JULY 1984,}{Deposit:: 58 PP.}{Deposit:: KURTZ, H. F. AND L. H. BAUMGARDNER. ALUMINUM CH. IN MINERAL}{Deposit:: FACTS AND PROBLEMS, 1980 EDITION. BUMINES B671, 1980,}{Deposit:: PP. 9-34.}{Deposit:: MOEN, W. S. MINES AND MINERAL DEPOSITS OF WHATCOM COUNTY,}{Deposit:: WASHINGTON. WASHINGTON DEPT. OF NAURAL RESOURCES, DIV.}{Deposit:: OF MINES & GEOL., BULL. NO. 57, 1969, 134 PP.}{Deposit:: RESOURCE STRATEGIES INC. ALUMINA COSTS AND SUPPLY}{Deposit:: ARRANGEMENTS IN THE PACIFIC NORTHWEST. PREPARED FOR BPA,}{Deposit:: EXTON, PA., MAY 1985, 46 PP.}{Deposit:: RESOURCE STRATEGIES INC. ENERGY CONSERVATION POTENTIAL AND}{Deposit:: SMELTER MODERNIZATION IN THE PACIFIC NORTHWEST. PREPARED}{Deposit:: FOR BPA, EXTON, PA., MAY 1985, 34 PP.}{Ownership:: CRU METAL MONITOR. FEB. 1995.} |