Reference | {Deposit:: MESA HEALTH AND SAFETY INSPECTION REPORT JUNE 3, 1974}{Deposit:: FROM 75-EMJ DIR-500000 TO 1 MILLION TONS ORE. FROM 1974 MESA}{Deposit:: DATA MINE 25 MEN MILL 139 MEN.}{Deposit:: MSHA INSPECTION REPORT 3-2-81.}{Deposit:: RCF AND CMS LISTS 10/81} |