Mine detail: Cabildo Concentrator

<< Back to the map

Location

Lat / long: -32.49747, -70.99952

Resource(M)

Primary: Copper
Discovery year: 1963

Production

Operation type: Processing Plant
Development status: Producer
First production started: 1965

Geology

References

MAS3370010002
DEP10255405
Reference{Deposit:: SUTULOV, A., 1975, EL COBRE CHILENO: CODELCO PUBS., SANTIAGO}{Deposit:: 520 PGS.}{Deposit:: CRU INTERNATIONAL LTD., COPPER STUDIES, V 23/N 6, 12/95,}{Deposit:: P.7.}
ReporterLjb