Mine detail: (Facility) Mufulira Copper Refinery

Previously called 'Mufulira'

<< Back to the map

Location

Lat / long: -12.49741, 28.23463

Resource(M)

Primary: Copper

Production

Operation type: Processing Plant
Development status: Plant
First production started: 1952

Geology

References

MAS7940051006
DEP10257195
Reference{Deposit:: PINCOCK, ALLEN & HOLT, INC.; THE DEVELOPMENT OF ENGINEERING,}{Deposit:: OPERATING AND ENVIRONMENTAL COST DATA FOR INTERNATIONAL}{Deposit:: COPPER SMELTING AND REFINING OPERATIONS - MUFULIRA,}{Deposit:: ZAMBIA. BUMINES CONTRACT J0290007, JAN. 1991. FOR INF.,}{Deposit:: CONTACT S.W. TOWLE, TPO, BUMINES-MAFO, DENVER, CO.}{Production:: CHARLES RIVER ASSOCIATES, ELECTROLYTIC REFINERY PROFILE,}{Production:: MUFULIRA COPPER REFINERY, MARCH 25, 1985, P. 1.}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1992 ANNUAL REPORT,}{Production:: P. 52.}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1991 ANNUAL REPORT,}{Production:: P. 43.}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1990 ANNUAL REPORT,}{Production:: P. 41.}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1989 ANNUAL REPORT,}{Production:: P. 44.}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1988 ANNUAL REPORT,}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1987 ANNUAL REPORT,}{Production:: ZAMBIA CONSOLIDATED COPPER MINES LIMITED 1986 ANNUAL REPORT,}{Production:: P. 48.}
ReporterTowle, Stewart W.