Mine detail: (Facility) Sherwin Alumina Refinery

Previously called 'Corpus Cristi PlantSherwin Alumina Plant'

<< Back to the map

Location

Lat / long: 27.8836, -97.25029

Resource(M)

Primary: Aluminum

Production

Operation type: Processing Plant
Development status: Plant
First production started: 1952

Geology

References

MAS484090002
DEP10299930
Reference{Deposit:: E&MJ DIRECTORY 1973-74 OWN/OP: REYNOLDS METALS CO}{Deposit:: 1972 CAP: 722000 ST AL CONTENT}{Deposit:: BERG, ANDY. POINT COMFORT ALUMINA REFINERY, ALUMINUM}{Deposit:: COMPANY OF AMERICA, POINT COMFORT, TEXAS. MAS PROPERTY}{Deposit:: EVALUATION FILE REPORT, 1988.}{Deposit:: BROOK HUNT & ASSOCIATES LTD. (LONDON). ALUMINUM PRODUCTION}{Deposit:: COST SURVEY 1980-1982; V. I, SUMMAR, 119 PP; V. II,}{Deposit:: APPENDIX, 314 PP., JAN. 1984.}{Deposit:: COMMODITIES RESEARCH UNIT LTD. (LONDON) AND CRU CONSULTANTS}{Deposit:: INC. (NEW YORK). POWER COSTS AT ALUMINUM SMELTERS;}{Deposit:: PRICING, TARIFF ESCALATION, AND THE FUTURE SUPPLY OF LOW}{Deposit:: COST POWER. 1985, 394 PP.}{Deposit:: HANDLEMAN, M., AND R. F. NELSON. COMPLIANCE WITH STACK}{Deposit:: EMISSION REQUIREMENTS IN A TEXAS ALUMINA PLANT. TMS,}{Deposit:: PAPER NO. A74-67, METALLURGICAL SOCIETY OF AIME. 1974,}{Deposit:: 12 P.}{Deposit:: HOPPE, R. POINT COMFORT - REFINING BAUXITE TO ALUMINA -}{Deposit:: THE MIDPOINT BETWEEN MINE AND METAL. ENG. & MIN. J.,}{Deposit:: JULY 1979, PP. 114-119.}{Deposit:: KRAMER, D. A., AND F. A. PETERS. COST ESTIMATE OF THE}{Deposit:: BAYER PROCESS FOR PRODUCING ALUMINA BASED ON 1982}{Deposit:: EQUIPMENT PRICES. BUMINES IC 8958, 20 PP., 1983.}{Deposit:: RAYMOND KAISER ENGINEERS. CAPITAL AND OPERATING COST}{Deposit:: ESTIMATING SYSTEM FOR ALUMINA REFINERY FACILITIES.}{Deposit:: BUMINES OFR 79-86. 1985, 177 PP.}{Deposit:: WEISS, N. L. SME MINERAL PROCESSNG HANDBOOK. 1985, CH. 19,}{Deposit:: P. 15.}
ReporterLongwill, W.