Reference | {Deposit:: WESTERN MINER, ANALYTICAL CONTROL; MAY, 1975, P.9-16.}{Deposit:: B.C. DEPT. OF MINES AND PET. RES., G.E.M., 1973, P.23,67-69.}{Deposit:: ENG. AND MIN. JOUR., SEPT., 1973, P.108-114.}{Deposit:: COBBAN, GILLIAN, COMMINCO MOVES AHEAD ON BIG TRAIL PROJECT:}{Deposit:: NORTHERN MINER, NOV. 29, 1979, P.D31.}{Deposit:: ANALYTICAL CONTROL AND INSTRUMENTATION AT THE SULLIVAN CON-}{Deposit:: CENTRATOR, MAY 1975, WESTERN MINER, PP. 9-16.}{Deposit:: CAMPBELL, F.A., ETHIER, V.G., AND KROUSE, H.R., 1980, THE}{Deposit:: MASSIVE SULFIDE ZONE: SULLIVAN ORE BODY, ECONOMIC}{Deposit:: GEOLOGY, VOL. 75, PP. 916-926.}{Deposit:: COMINCO IN THE 8*, APRIL 11, 1980, MINING JOURNAL, P. 291.}{Deposit:: COMINCO LIMITED, 1972-79, ANNUAL REPORTS.}{Deposit:: COMINCO, RECORD SALES, MAY 9, 1980, MINING JOURNAL, P. 394.}{Deposit:: ETHIER, V.G., CAMPBELL, F.A., BOTH, R.A., AND KROUSE, H.R.,}{Deposit:: 1976, GEOLOGICAL SETTING OF THE SULLIVAN OREBODY AND ES-}{Deposit:: TIMATES OR TEMPERATURES AND PRESSURES OF METAMORPHISM,}{Deposit:: ECONOMIC GEOLOGY, VOL. 71, PP. 1570-1588.}{Deposit:: FREEZE, A.C., 1966, ON THE ORIGIN OF THE SULLIVAN OREBODY,}{Deposit:: KIMBERLEY, B.C., TECTONIC HISTORY AND MINERAL DEPOSITS OF}{Deposit:: THE WESTERN CORDILLERA, SPECIAL VOLUME NO. 8, PP. 263-294}{Deposit:: HOY, TRYGVE, OCTOBER 24, 1980, STRATIGRAPHIC AND STRUCTURAL}{Deposit:: SETTING OF STRATABOUND LEAD-ZINC DEPOSITS IN SOUTHEASTERN}{Deposit:: B.C., PRESENTED AT THE 5TH ANNUAL CIM DISTRICT 6 MEETING,}{Deposit:: INTERNATIONAL GEOLOGICAL CONGRESS, 1972, GUIDEBOOK, FIELD}{Deposit:: EXCURSION A24-C24, 24TH SESSION, CANADA, PP. 26-36.}{Deposit:: MINERAL POLICY SECTOR, DEPARTMENT OF ENERGY, MINES AND RE-}{Deposit:: SOURCES, 1973, SULLIVAN, OTTAWA, CANADA.}{Deposit:: SPATE OF NEW MINES, OCTOBER 10, 1980, MINING JOURNAL, P. 286}{Deposit:: THE SULLIVAN: HEAD OF COMINC* MINING EMPIRE, SEPT., 1973,}{Deposit:: ENGINEERING AND MINING JOURNAL, PP. 108-114.}{Deposit:: WHITE, LANE AND JACKSON, DANIEL, JR., SEPT. 1973, COMINCO:}{Deposit:: MODERN, RESOURCEFUL, SUCCESSFUL; ENGINEERING AND MINING}{Deposit:: JOURNAL, PP. 71-86.}{Production:: JACOBI, H.P., COMINCO LTD.- SULLIVAN CONCENTRATOR; D.E.}{Production:: PICKETT, ED., IN MILLING PRACTICE IN CANADA, CIM SPECIAL}{Production:: VOLUME 16, 1978, P.208-214.}{Production:: COMINCO LTD. STAFF, SULLIVAN CONCENTRATOR- KIMBERLEY, B.C.;}{Production:: IN MINERAL INDUSTRIES IN WESTERN CANADA, THE TENTH}{Production:: COMMONWEALTH MINING AND METALLURGICAL CONGRESS-SEPT.2-28,}{Production:: 1974, SECTION VI, ARTICLE E, P.1-13.}{Production:: *CRU QUARTERLY MARKET SERVICE, LEAD, JAN. 1994, P. 34.}{Reserve-Resource:: AME MINERAL ECONOMICS QUARTERLY MINE ANALYSIS, JUNE 1993,}{Reserve-Resource:: P. 38.}{Reserve-Resource:: P. 38, 43.}{Reserve-Resource:: 1995 COMINCO ANNUAL REPORT-PG 37.-ALSO ADIT.}{Workings:: FISH, RICHARD, SULLIVAN MINE GOES TRACKLESS; CANADIAN MINING}{Workings:: JOURNAL, JUNE, 1978, P.38,39.}{Workings:: REYNOLDS, J.W., PNEUMATIC BACKFILLING WITH CRUSHED ROCK AT}{Workings:: THE SULLIVAN MINE; CIM BULL., JULY, 1972, P.31-36.}{Workings:: COMINCO LTD. STAFF, SULLIVAN MINE- KIMBERLEY, B.C., IN}{Workings:: MINERAL INDUSTRIES IN WESTERN CANADA, THE TENTH COMMON-}{Workings:: WEALTH MINING AND METALLURGICAL CONGRESS- SEPT. 2-28,}{Workings:: 1974, SECTION VI, ARTICLE D, P.1-16.} |