| Lat / long: | 10.90053, 124.43253 |
| Primary: | Copper |
| Secondary: | Sulfur, Sulfuric Acid |
| Tertiary: | Gypsum-Anhydrite |
| Operation type: | Processing Plant |
| Development status: | Plant |
| First production started: | 1983 |
| MAS | 5650131001 |
| DEP | 10304257 |
| Reference | {Deposit:: PINCOCK, ALLEN & HOLT, INC. THE DEVELOPMENT OF ENGINEERING}{Deposit:: OPERATING AND ENVIRONMENTAL COST DATA FOR INTERNATIONAL}{Deposit:: COPPER SMELTING AND REFINING OPERATIONS. BUMINES CONTRACT}{Deposit:: J0290007; FOR INF. CONTACT S.W. TOWLE, TPO, BUMINES-MAFO,}{Deposit:: DENVER, CO.}{Deposit:: CRU COPPER STUDIES. V. 19, NO. 5, 11/91, P6.} |
| Reporter | Towle, Stewart W. |