| Lat / long: | 64.99667, -147.79095 |
| Primary: | Gold |
| Ore: | Gold |
| Operation type: | Unknown |
| Development status: | Prospect |
| Alteration processes: | Schist fragments in soils appear to be weakly argillized, bleached, and veined with quartz. The Redline shear was recognized in the drill hole as argillized, black, silicified phyllite. The sheared upper contact of an intrusive body is marked by carbonate and limonite alteration (Dashevsky, 1993). |
| DEP | 10307443 |
| Reference | Dashevsky, S.S., 1993, Eagle Creek project (Au), Fairbanks district, Alaska: American Copper and Nickel Company, Inc., 60 p. (Report held by Sam Dashevsky, Northern Associates Inc., Fairbanks, Alaska; can be examined with permission from current lease holders). |
| Reporter | J.R. Guidetti Schaefer and C.J. Freeman |